fix: case study copy
This commit is contained in:
@@ -110,7 +110,7 @@
|
||||
"The old bathroom was stripped out and all rubbish removed.",
|
||||
"The walls were tiled with marble effect tiles and new spot lights were installed in the ceiling.",
|
||||
"The new bathroom was then installed, including a new shower mixer and towel radiator plumbed in to the wall.",
|
||||
"Total price for labour and materials: £3,500."
|
||||
"Total price for labour and materials: £3,800."
|
||||
]
|
||||
},
|
||||
{
|
||||
|
||||
Reference in New Issue
Block a user