fix: case study copy

This commit is contained in:
2021-02-11 20:25:17 +00:00
parent c81c09b9ed
commit b0b99ea082

View File

@@ -110,7 +110,7 @@
"The old bathroom was stripped out and all rubbish removed.", "The old bathroom was stripped out and all rubbish removed.",
"The walls were tiled with marble effect tiles and new spot lights were installed in the ceiling.", "The walls were tiled with marble effect tiles and new spot lights were installed in the ceiling.",
"The new bathroom was then installed, including a new shower mixer and towel radiator plumbed in to the wall.", "The new bathroom was then installed, including a new shower mixer and towel radiator plumbed in to the wall.",
"Total price for labour and materials: £3,500." "Total price for labour and materials: £3,800."
] ]
}, },
{ {