title: Mosaic Tiling
|
||||
location: Brentwood, Essex
|
||||
date: '2020-11-01'
|
||||
features: [Electric alcove, Mosaic tiling, Under floor heating]
|
||||
price: £6,500
|
||||
duration: 12 days
|
||||
image: 12
|
||||
images: 13
|
||||
---
|
||||
|
||||
Completely strip out old bathroom and dispose of all rubbish.
|
||||
|
||||
Relocate soil pipe to install toilet in new location.
|
||||
|
||||
Fitted electric under floor heating.
|
||||
|
||||
Installed mosaic wall tiles.
|
||||
|
||||
Total price for labour and materials: £6,500.
|
||||
(This does not include bathroom suite or tiles)
|
||||