title: Modern Bathroom
|
||||
location: Maldon, Essex
|
||||
date: '2020-12-01'
|
||||
features: [Damp proofing, Tiling, Alcove lighting]
|
||||
price: £5,900
|
||||
duration: 12 days
|
||||
image: 0
|
||||
images: 5
|
||||
---
|
||||
|
||||
This medium sized bathroom in Maldon, Essex came with very few design problems.
|
||||
|
||||
The old bathroom was completely stripped out to a shell. The bathroom showed
|
||||
small signs of damp which was easily rectified with a waterproof membrane
|
||||
inserted within the shower walls.
|
||||
|
||||
The client decided to replace the old bath with a large walk-in shower. Client
|
||||
chose to have a false ceiling installed with spot lights and an alcove with
|
||||
electrics and lighting was fitted to give the bathroom a warm feeling.
|
||||
|
||||
We stripped out the old bathroom and disposed of all rubbish. We tiled, plastered
|
||||
and painted the floor and walls, installed the new bathroom with tiling,
|
||||
plastering, painting and all electrical works.
|
||||
|
||||
Total price for labour and building materials: £5,900.
|
||||
(This does not include bathroom suite or tiles)
|
||||
24
case-studies/102.md
Normal file
24
case-studies/102.md
Normal file
@@ -0,0 +1,24 @@
|
||||
---
|
||||
title: Compact Bathroom
|
||||
location: Hackney, London
|
||||
date: '2020-11-01'
|
||||
features: [Damp proofing, Recessed shower mixer]
|
||||
price: £5,000
|
||||
duration: 10 days
|
||||
image: 0
|
||||
images: 3
|
||||
---
|
||||
|
||||
Very small bathroom in a block of flats In Hackney, E9.
|
||||
|
||||
Existing bathroom was extremely old. We stripped the bathroom back to the shell
|
||||
and addressed damp issues.
|
||||
|
||||
Client went with our suggestion of using two different wall tiles.
|
||||
|
||||
Shower mixer was inserted in to wall to give the bathroom a modern, minimal feel.
|
||||
|
||||
Bathroom went from old and dated to fresh and modern.
|
||||
|
||||
Total price for labour and materials: £5,000.
|
||||
(This does not include bathroom suite or tiles)
|
||||
22
case-studies/103.md
Normal file
22
case-studies/103.md
Normal file
@@ -0,0 +1,22 @@
|
||||
---
|
||||
title: Modest Shower Room
|
||||
location: Maldon, Essex
|
||||
date: '2021-01-01'
|
||||
features: [Accessible shower, False ceiling with spot lights]
|
||||
price: £5,300
|
||||
duration: 10 days
|
||||
image: 0
|
||||
images: 3
|
||||
---
|
||||
|
||||
Medium sized bathroom for an elderly lady who had trouble getting in and out of the bath.
|
||||
|
||||
Complete refurbishment, bathroom was 20 years old and showed signs of damp.
|
||||
|
||||
Completely stripped out old bathroom, disposed of all rubbish and left to air
|
||||
out with windows open for 3 days.
|
||||
|
||||
New bathroom installed with a fresh look and easy to maintain. 4 spot lights installed in false ceiling.
|
||||
|
||||
Total price for labour and materials: £5,300.
|
||||
(This does not include bathroom suite or tiles)
|
||||
19
case-studies/104.md
Normal file
19
case-studies/104.md
Normal file
@@ -0,0 +1,19 @@
|
||||
---
|
||||
title: Period with a Modern Twist
|
||||
location: Hampstead, London
|
||||
date: '2020-10-01'
|
||||
features: [Period features with a modern twist]
|
||||
price: £8,800
|
||||
duration: 3 weeks
|
||||
image: 0
|
||||
images: 3
|
||||
---
|
||||
|
||||
A complete refurbishment in a three bedroom house in Hampstead, London.
|
||||
|
||||
Existing bathroom was more than 20 years old. We completely stripped out the old bathroom and disposed of all rubbish.
|
||||
|
||||
Client went for a Victorian style with a modern twist.
|
||||
|
||||
Total price for labour and materials: £8,800.
|
||||
(This does not include bathroom suite or tiles)
|
||||
18
case-studies/105.md
Normal file
18
case-studies/105.md
Normal file
@@ -0,0 +1,18 @@
|
||||
---
|
||||
title: En-suite
|
||||
location: Chelmsford, Essex
|
||||
date: '2020-12-01'
|
||||
features: [Feature wall with an alcove shelf]
|
||||
price: £7,400
|
||||
duration: 11 days
|
||||
image: 0
|
||||
images: 2
|
||||
---
|
||||
|
||||
2 bedroom flat Chelmsford. An en-suite bathroom. The existing bathroom was 10 years old and very dated.
|
||||
|
||||
Client went for fairly cheap products and tiles to keep within their budget.
|
||||
|
||||
Service included stripping out old bathroom and disposing of all rubbish, supplying and fitting everything.
|
||||
|
||||
Total price for labour and materials: £7,400.
|
||||
16
case-studies/106.md
Normal file
16
case-studies/106.md
Normal file
@@ -0,0 +1,16 @@
|
||||
---
|
||||
title: Metro style washroom
|
||||
location: Ilford, London
|
||||
date: '2021-02-01'
|
||||
features: [Metro tiles]
|
||||
price: £4,250
|
||||
duration: 5 days
|
||||
image: 0
|
||||
images: 3
|
||||
---
|
||||
|
||||
For this modest sized washroom, we stripped out the existing facilities and disposed of all rubbish, supplied and fitted a new toilet, sink and radiator.
|
||||
|
||||
We also tiled the room with metro style tiles for a modern look.
|
||||
|
||||
Total price for labour and materials: £4,250.
|
||||
19
case-studies/107.md
Normal file
19
case-studies/107.md
Normal file
@@ -0,0 +1,19 @@
|
||||
---
|
||||
title: Marble Effect Tiling
|
||||
location: Harold Wood, Essex
|
||||
date: '2021-02-01'
|
||||
features: [Shower mixer, Spot lights, Tiled walls and bath panel]
|
||||
price: £4,800
|
||||
duration: 6 days
|
||||
image: 0
|
||||
images: 5
|
||||
---
|
||||
|
||||
The old bathroom was stripped out and all rubbish removed.
|
||||
|
||||
The walls were tiled with marble effect tiles and new spot lights were installed in the ceiling.
|
||||
|
||||
The new bathroom was then installed, including a new shower mixer and towel radiator plumbed in to the wall.
|
||||
|
||||
Total price for labour and materials: £4,800.
|
||||
(This does not include bathroom suite or tiles)
|
||||
19
case-studies/108.md
Normal file
19
case-studies/108.md
Normal file
@@ -0,0 +1,19 @@
|
||||
---
|
||||
title: Shower Room
|
||||
location: Brentwood, Essex
|
||||
date: '2021-02-01'
|
||||
features: [Skylight feature]
|
||||
price: £5,400
|
||||
duration: 9 days
|
||||
image: 9
|
||||
images: 10
|
||||
---
|
||||
|
||||
The old bathroom was stripped out and all rubbish removed.
|
||||
|
||||
Once empty, we treated the room for damp.
|
||||
|
||||
Room was tiled and painted before the new bathroom suite was installed.
|
||||
|
||||
Total price for labour and materials: £5,400.
|
||||
(This does not include bathroom suite or tiles)
|
||||
21
case-studies/109.md
Normal file
21
case-studies/109.md
Normal file
@@ -0,0 +1,21 @@
|
||||
---
|
||||
title: Mosaic Tiling
|
||||
location: Brentwood, Essex
|
||||
date: '2020-11-01'
|
||||
features: [Electric alcove, Mosaic tiling, Under floor heating]
|
||||
price: £6,500
|
||||
duration: 12 days
|
||||
image: 12
|
||||
images: 13
|
||||
---
|
||||
|
||||
Completely strip out old bathroom and dispose of all rubbish.
|
||||
|
||||
Relocate soil pipe to install toilet in new location.
|
||||
|
||||
Fitted electric under floor heating.
|
||||
|
||||
Installed mosaic wall tiles.
|
||||
|
||||
Total price for labour and materials: £6,500.
|
||||
(This does not include bathroom suite or tiles)
|
||||
19
case-studies/110.md
Normal file
19
case-studies/110.md
Normal file
@@ -0,0 +1,19 @@
|
||||
---
|
||||
title: Victorian Look
|
||||
location: Fulham, London
|
||||
date: '2021-02-01'
|
||||
features: [Walk in shower, Victorian style tiling]
|
||||
price: £5,500
|
||||
duration: 10 days
|
||||
image: 3
|
||||
images: 6
|
||||
---
|
||||
|
||||
Stripped out old bathroom and disposed of all rubbish.
|
||||
|
||||
Tiled wall and floor with Victorian style tiling.
|
||||
|
||||
Recessed plumbing for wall mounted shower unit.
|
||||
|
||||
Total price for labour and materials: £5,500.
|
||||
(This does not include bathroom suite or tiles)
|
||||
19
case-studies/111.md
Normal file
19
case-studies/111.md
Normal file
@@ -0,0 +1,19 @@
|
||||
---
|
||||
title: Two bathrooms
|
||||
location: Ware, Hertfordshire
|
||||
date: '2021-03-01'
|
||||
features: [Free standing baths, Wall hung toilets, Spot lights]
|
||||
price: £17,000
|
||||
duration: 3 weeks
|
||||
image: 11
|
||||
images: 15
|
||||
---
|
||||
|
||||
Stripped out old bathrooms and disposed of all rubbish.
|
||||
|
||||
Tiled both rooms and installed recessed spot lights.
|
||||
|
||||
Fitted free standing baths and wall mounted toilet basins.
|
||||
|
||||
Total price for labour and materials: £17,000.
|
||||
(This does not include bathroom suites or tiles)
|
||||
15
case-studies/112.md
Normal file
15
case-studies/112.md
Normal file
@@ -0,0 +1,15 @@
|
||||
---
|
||||
title: Modern Bathroom
|
||||
location: Fulham, London
|
||||
date: '2021-11-01'
|
||||
features: [Shower, bath, vanity unit and toilet]
|
||||
price: £8,650
|
||||
duration: 3 weeks
|
||||
image: 5
|
||||
images: 9
|
||||
---
|
||||
|
||||
Stripped out old bathrooms and disposed of all rubbish.
|
||||
|
||||
Total price for labour and materials: £8,650.
|
||||
(This does not include bathroom suites or tiles)
|
||||
19
case-studies/201.md
Normal file
19
case-studies/201.md
Normal file
@@ -0,0 +1,19 @@
|
||||
---
|
||||
title: New Extension
|
||||
location: Eltham, London
|
||||
date: '2020-11-01'
|
||||
features: [Under floor heating]
|
||||
price: £2,400
|
||||
duration: 4 days
|
||||
image: 3
|
||||
images: 4
|
||||
---
|
||||
|
||||
20 square meters of floor tiles laid in a new extension.
|
||||
|
||||
We fitted under floor heating before laying self levelling compound.
|
||||
|
||||
The tiles were also grouted and sealed.
|
||||
|
||||
The project took 4 days to complete.
|
||||
Total price for labour and materials: £2,400.
|
||||
20
case-studies/202.md
Normal file
20
case-studies/202.md
Normal file
@@ -0,0 +1,20 @@
|
||||
---
|
||||
title: Ceramic Floor Tiles
|
||||
location: Brentwood, Essex
|
||||
date: '2020-12-01'
|
||||
features: [Ceramic floor tiles]
|
||||
price: £1,100
|
||||
duration: 1 day
|
||||
image: 3
|
||||
images: 5
|
||||
---
|
||||
|
||||
The client needed 19 square meters of ceramic floor tiles fitted at short notice.
|
||||
|
||||
We first applied self leveling compound as the concrete floor was quite uneven. After 2 days to allow for the compound to completely dry, we returned to install the tiles.
|
||||
|
||||
The installation was completed in one day and the client was able to continue with the kitchen installation the following day.
|
||||
|
||||
The client provided the ceramic floor tiles and we provided the levelling compound, adhesive and grout.
|
||||
|
||||
Total price for labour and materials: £1,100.
|
||||
18
case-studies/203.md
Normal file
18
case-studies/203.md
Normal file
@@ -0,0 +1,18 @@
|
||||
---
|
||||
title: Period Floor Tiles
|
||||
location: Barnes, London
|
||||
date: '2020-10-01'
|
||||
features: [Period style tiles]
|
||||
price: £2,100
|
||||
duration: 5 days
|
||||
image: 0
|
||||
images: 1
|
||||
---
|
||||
|
||||
This room had old porcelain tiles, which we removed and disposed. We then applied self levelling compound to the floor and allowed to set for 24 hours.
|
||||
|
||||
All skirting and radiators were removed.
|
||||
|
||||
20 square meters of new tiles were laid and sealed for protection.
|
||||
|
||||
Total price for labour and materials: £2,100.
|
||||
20
case-studies/204.md
Normal file
20
case-studies/204.md
Normal file
@@ -0,0 +1,20 @@
|
||||
---
|
||||
title: Wood Effect Porcelain
|
||||
location: Charlton, London
|
||||
date: '2020-10-01'
|
||||
features: [Wood effect porcelain tiles]
|
||||
price: £3,100
|
||||
duration: 7 days
|
||||
image: 0
|
||||
images: 1
|
||||
---
|
||||
|
||||
Client needed old wooden floor removed. Once floor was removed 12mm concrete boards were laid to create a solid foundation.
|
||||
|
||||
50 square meters long porcelain tiles were laid sealed and grouted.
|
||||
|
||||
All rubbish was removed from site and included in the price.
|
||||
|
||||
We supplied all materials except tiles.
|
||||
|
||||
Total price for labour and materials: £3,100.
|
||||
20
case-studies/205.md
Normal file
20
case-studies/205.md
Normal file
@@ -0,0 +1,20 @@
|
||||
---
|
||||
title: Period Floor Tiles
|
||||
location: Chelsea, London
|
||||
date: '2020-10-01'
|
||||
features: [Under floor heating]
|
||||
price: £5,600
|
||||
duration: 2 weeks
|
||||
image: 0
|
||||
images: 1
|
||||
---
|
||||
|
||||
Existing floor consisted of dated tiles, client wanted to replace them and install under floor heating at the same time.
|
||||
|
||||
Floor and adhesive was removed and disposed.
|
||||
|
||||
Electric under floor heating system was installed and levelling compound applied.
|
||||
|
||||
54 square meters new tiles were laid, grouted and sealed.
|
||||
|
||||
Total price for labour and materials: £5,600.
|
||||
16
case-studies/206.md
Normal file
16
case-studies/206.md
Normal file
@@ -0,0 +1,16 @@
|
||||
---
|
||||
title: Patterned Floor Tiles
|
||||
location: Fulham, London
|
||||
date: '2020-10-01'
|
||||
features: [Under floor heating]
|
||||
price: £4,500
|
||||
duration: 1 week
|
||||
image: 0
|
||||
images: 1
|
||||
---
|
||||
|
||||
Removed old flooring and adhesive and disposed of all rubbish.
|
||||
|
||||
Installed electric under floor heating and laid 35 square meters of new tiles.
|
||||
|
||||
Total price for labour and materials: £4,500.
|
||||